Product engineering
Design for manufacturing starts before the drawing release
Read the perspective
Manufacturability is cheapest to fix on the screen. Once tooling, fixtures and supplier quotes exist, every change carries cost and delay.
Bring manufacturing and supplier input into the design review early. Check assembly access, tolerance stack-ups, material and process limits, and inspection methods while the geometry is still easy to change.
Record the assumptions behind each decision. When a drawing is released with its reasoning attached, downstream teams can build it the way it was intended.